Birkdale Road, Birkdale
Corridor Works and Tie-ins

Our scope included:
Public infrastructure upgrade to suit 6 lot development
- Site Survey and Setout
- 65m+ 250OD PE stormwater line directionally drilled down live level 2 road
- 20m+ 125OD PE watermain directionally drilled across Birkdale Road
- Asphalt reinstatement + Line marking
- Vehicle crossing re-alignment
- As-builts and CCTV records
Our scope included:
Public infrastructure upgrade to suit 6 lot development
- Site Survey and Setout
- 65m+ 250OD PE stormwater line directionally drilled down live level 2 road
- 20m+ 125OD PE watermain directionally drilled across Birkdale Road
- Asphalt reinstatement + Line marking
- Vehicle crossing re-alignment
- As-builts and CCTV records
In collaboration with Goodwin Residential our team were tasked with upgrading and extending the public infrastructure into their development site. Works within the road corridor were conducted within a small 6 hour window each day due to the volume of traffic and nearby school.